An official website of the United States government
Here’s how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock
( )
or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
The new Douglas Land Port of Entry is a planned commercial port construction project 4.5 miles west of the existing Raul Hector Castro LPOE in Douglas, Arizona. Upon its completion, U.S. Customs and Border Protection will permanently relocate commercial inspection operations from the Castro LPOE to the newly constructed dedicated commercial Douglas LPOE. The project, funded by the Bipartisan Infrastructure Law, will significantly expand commercial vehicle inspection capacity and allow the processing of oversized mining equipment too large to cross through the Castro LPOE. Furthermore, relocating commercial operations to the Douglas LPOE and away from downtown will support municipal redevelopment plans for its historic downtown district and help transform Douglas into a 21st-century regional tourism gateway and commercial transportation hub.
The U.S. General Services Administration is developing a master plan for both projects in Douglas to ensure seamless project delivery and provide the best value for the American taxpayer. The port project is already spurring additional investments with the construction of a new utility corridor along State Route 80, a new industrial warehouse and business park zone, the installation of broadband internet infrastructure, as well as the chance to bring new construction, service, and manufacturing jobs to this remote region in Southeast Arizona.
GSA initiated its programmatic Environmental Impact Statement (EIS) process in Spring 2022 and will continue evaluating the potential impact of the modernization and expansion project through May 2024. As part of the EIS process, GSA will conduct public meetings to gather input from the local community and key stakeholders.
Environmental review
GSA began its programmatic environmental impact statement process in Spring 2022 and continued to evaluate the potential impact of the modernization and expansion project through Fall 2023. As part of the EIS process, GSA conducted public meetings to gather input from the local community and key stakeholders. The final EIS documents are available for review.
Local updates
Traffic advisories
There are no traffic advisories currently in place.
Environmental impact statement Spring 2022–Fall 2023
Architecture and engineering services award July 2022
Design-build award September 2024
Start Fall 2025
Substantial completion Fall 2028
Bipartisan Infrastructure Law
We received $3.4 billion to invest in our nation’s infrastructure and competitiveness. The law provides funding for LPOE modernization projects that will create new good-paying jobs, bolster safety and security, and make our economy more resilient to supply chain challenges — all while serving as models for sustainability and innovation.
Visit the Arizona LPOE page for an overview of BIL projects there, as well as priorities, benefits and further information.
Sustainability opportunities
We will increase energy and water efficiency (including renewable energy and fossil fuel free measures), adhere to sustainable design principles, and minimize climate risk liabilities above the minimum performance criteria in a manner that is life cycle cost-effective.
Community impact
The Douglas and Castro LPOE projects jointly represent the most significant port infrastructure federal investment in a generation. Not only will the Douglas LPOE address past environmental justice issues by relocating commercial operations away from downtown communities, but it also sets the stage to boost the regional economy with a commercial inspection capacity that will exceed that of the Castro LPOE. The port’s economic potential is attracting private investment in nearby supporting commercial infrastructure and the installation of new utilities.
PER DIEM LOOK-UP
1
Choose a location
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Get my location
OR
OR
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Traveler reimbursement is based on the location of the work activities and not the accommodations,
unless lodging is not available at the work activity, then the agency may authorize the rate where
lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely
surrounded by, the corporate limits of the key city, including independent entities located within
those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely
surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties,
including independent entities located within the boundaries of the key city and the listed counties
(unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is
located partially within more than one city or county boundary, the applicable per diem rate for the
entire installation or facility is the higher of the rates which apply to the cities and / or counties,
even though part(s) of such activities may be located outside the defined per diem locality.