The new Rouses Point LPOE modernization replaces the existing LPOE which is located approximately one-half mile south of the border. The new LPOE will improve important border security, CBP operations, and CBP Officer safety requirements in a number of areas. This project will facilitate the development of one of only three international rail passenger crossing points in the U.S., and will be the only location that enables passenger inspections at the LPOE. Sustainability objectives include carefully designing the LPOE to minimally disturb the ecology of the regulated wetland on which it is situated, designing an all-electric net-zero energy-ready facility that includes geothermal heating and cooling, and using carbon sequestering mass-timber building materials.
Average yearly border crossings:
42,000 personal vehicles
85,000 commercial vehicles
2,000 pedestrians
Current status
Following two global community engagement and scoping meetings, and two peer reviews under the GSA Design Excellence program, the concept design was approved March 24, 2023. The focus is on incorporating suggestions from the community, and freight and passenger railroad requirements. Concurrent activities include concept design phase scope and cost alignment; wetland disturbance mitigation planning with state and federal regulatory authorities; and development of the environmental assessment report in accordance with the National Environmental Policy Act.
Environmental and site needs
July 2022–August 2023
Award
May 2022
Award
January 2024
Substantial completion
November 2025
SAM.gov
Next solicitation opportunity is expected Summer 2024.
Bipartisan Infrastructure Law
We received $3.4 million to invest in our nation’s infrastructure and competitiveness. The law provides funding for LPOE modernization projects that will create new good-paying jobs, bolster safety and security, and make our economy more resilient to supply chain challenges — all while serving as models for sustainability and innovation.
Visit the New York LPOE page for an overview of BIL projects there, as well as priorities, benefits and further information.
Sustainability opportunities
This project will result in an all-electric, high-performing, energy efficient LPOE with the objective of capitalizing on net-zero energy technologies, including geothermal heating and cooling, and photovoltaic. This EISA 438-compliant project is planning to include gray water recycling as part of its sustainability approach. The new LPOE plans to use timber framing and other sustainable, carbon sequestration technologies, along with a focus on specifying the use of reduced carbon building materials.
Community impact
This project will improve the connection between the local communities and commercial metropolitan areas of both countries and on both sides of the border, which will improve the conditions for economic, cultural, and familial connections. The people who live along the border depend on this cross-border community engagement, often crossing through the ports daily for jobs, mutual aid, and everyday life.
PER DIEM LOOK-UP
1
Choose a location
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Get my location
OR
OR
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Traveler reimbursement is based on the location of the work activities and not the accommodations,
unless lodging is not available at the work activity, then the agency may authorize the rate where
lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely
surrounded by, the corporate limits of the key city, including independent entities located within
those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely
surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties,
including independent entities located within the boundaries of the key city and the listed counties
(unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is
located partially within more than one city or county boundary, the applicable per diem rate for the
entire installation or facility is the higher of the rates which apply to the cities and / or counties,
even though part(s) of such activities may be located outside the defined per diem locality.