Goodfellow Federal Center Environmental Reading Room

Environmental project

GSA continues extensive research to better monitor environmental conditions at the Goodfellow Federal Center.

No one is allowed to access restricted spaces due to contamination, unless GSA has an accepted Site Specific Safety Plan on file. Contact diane.czarnecki@gsa.gov or 816-926-7223 for help or to get more information. 

Where we have identified environmental contamination, we must accept your SSSP before any tenant agency employees, contractors or visitors access or work in the areas.

Space(s) and equipment where we have identified environmental contamination

  • Mechanical rooms and spaces
  • Telephone and electrical closets
  • Secured janitorial closets
  • Above suspended ceilings
  • Below raised floors
  • Penthouses, including elevator equipment rooms
  • HVAC air handlers, variable air volume equipment, and ductwork
  • Stairwells leading to and from basements and penthouses
  • Basements (concrete floors), utility tunnels, and crawl spaces (dirt floors are contaminated with friable asbestos and friable asbestos debris — asbestos debris is up to 90% asbestos — as well as other contaminants)
  • Sump pumps and sump pump water/groundwater
  • In concrete where polychlorinated biphenyl (PCB) oil-filled transformers used to be
  • Substations and electrical vaults
  • Warehouses
  • Loading docks
  • Storage rooms
  • Surfaces above 70 inches
  • All exterior equipment on rooftops or ground
  • Exterior grounds (soil)
  • Unoccupied space (see table below)

Unoccupied space that requires an SSSP for access

Building Location Previous occupant
101 Entire facility  
102E Entire facility (NEW) Veterans Administration
103 Entire facility Defense Information Security Agency, U.S. Department of Agriculture, Census Bureau, and Navy
103D Entire second floor U.S. Department of Agriculture
103F Entire building Cafe
104 Entire first floor Veterans Administration
104E Entire first floor Veterans Administration
105F Entire facility USDA, Snack Shop
105L Entire facility, except MERS/Goodwill space  
107 Entire second floor U.S. Probation
108A Entire facility None
108B Entire facility None
110 All but dock and garage SSA and DCAA
115 Entire facility Fitness center
122B Entire facility O&M, Custodial
208B Entire facility Outlease

Access to records

GSA reviewed documents contained in the reading room to protect controlled unclassified, sensitive but unclassified, and for official use only information. While we are unable to make unredacted CUI publicly available in the online reading room, we can arrange access to the CUI for individuals who have a need to know. You can email r6environmental@gsa.gov to request this access. Hard copy records are available by visiting GSA in Building 107 7 a.m.3:30 p.m. weekdays.

The files in this electronic reading room may not be fully compliant with the revised Section 508 standards — specifically, reports or appendices within reports from companies besides Burns and McDonnell or GSA, which are primarily dated prior to Dec. 1, 2020.  If the format of any material on this page interferes with your ability to access the information, please contact us at r6environmental@gsa.gov or 816-223-6198.

To allow us to respond in a manner most helpful to you, please let us know:

  1. Nature of your accessibility issue.
  2. Preferred format in which to receive the material.
  3. Web address (URL) of the material with which you are having difficulty.
  4. Your contact information.

Send questions and comments about GSA’s ongoing environmental program to GSA’s Region 6 Environmental Team by email at r6environmental@gsa.gov.

General information

Safety Data Sheets for hazardous chemicals [PDF - 14 MB]
Checklist for Site-Specific Safety Plans [PDF - 69 KB] 
CERCLA clean-up process [PDF - 693 KB]

Reading room records

2024 records

Building sampling

  DRINKING WATER AIR WIPE
January  
February  
March   
April   
May  
June  
July   
August    
September    
October 
   
November    
December      

    2023 records

    Groundwater sampling

    Building sampling

      DRINKING WATER AIR WIPE
    January    
     
    February  
    March 
     
    April   
    May   Bldg 107 air and wipe sampling May 3 [PDF - 847 KB]
    June  
     
    July   
    August  
    September  

    October 

     
    November  
    December  

      2022 records

      Groundwater sampling

      Soil sampling

      Building sampling

        DRINKING WATER AIR WIPE
      October 2021 Bldg 105 drinking water introduction [PDF - 86 KB]
      Drinking water resampling [PDF - 1 MB]
      Sequential drinking water testing [PDF - 1 MB]
        Campus-wide wipe sampling for lead from restroom surfaces [PDF - 915 KB]
      November 2021   Bldg 107 high space air and wipe sampling [PDF - 2 MB]
      December 2021  

      Introduction [PDF - 51 KB]
      Bldg 102E [PDF - 801 KB]
      Bldg 103 [PDF - 786 KB]
      Bldg 103D [PDF - 777 KB]
      Bldg 103E [PDF - 766 KB]
      Bldg 104 [PDF - 1 MB]
      Bldg 104E [PDF - 798 KB]
      Bldg 104F [PDF - 778 KB]
      Bldg 105 [PDF - 1 MB]
      Bldg 105E [PDF - 773 KB]
      Bldg 105F [PDF - 738 KB]
      Bldg 106 [PDF - 1 MB]
      Bldg 107 [PDF - 777 KB]
      Bldg 110 [PDF - 789 KB]

      Introduction [PDF - 102 KB]
      Bldg 102E [PDF - 809 KB]
      Bldg 103 [PDF - 824 KB]
      Bldg 103D [PDF - 813 KB]
      Bldg 103E [PDF - 816 KB]
      Bldg 104 [PDF - 1 MB]
      Bldg 104E [PDF - 802 KB]
      Bldg 104F [PDF - 805 KB]
      Bldg 105 [PDF - 1 MB]
      Bldg 105E [PDF - 840 KB]
      Bldg 105F [PDF - 821 KB]
      Bldg 106 [PDF - 1 MB]
      Bldg 107 [PDF - 813 KB]
      Bldg 110 [PDF - 822 KB]

      January  

      Bldg 104 air and wipe sampling Jan. 13 [PDF - 274 KB]
      Bldg 104 air and wipe sampling Jan. 26 [PDF - 1 MB]
      Bldg 105 air and wipe sampling Jan. 13 [PDF - 310 KB]
      Bldg 105 air and wipe sampling Jan. 26 [PDF - 2 MB]
      Bldg 107 air and wipe sampling Jan. 7 [PDF - 290 KB]
      Bldg 107 air and wipe sampling Jan. 19 [PDF - 982 KB]
      Bldg 107 air and wipe sampling Jan. 31 [PDF - 3 MB]

      February   Bldg 104 air and wipe sampling Feb. 11 [PDF - 1 MB]
      Bldg 104 air and wipe sampling Feb. 23 [PDF - 305 KB]
      Bldg 105 air and wipe sampling Feb. 11 [PDF - 2 MB]
      Bldg 107 air and wipe sampling Feb. 14 [PDF - 3 MB]
      Campus-wide wipe resampling Feb. 23 [PDF - 486 KB]
      March

      Introduction [PDF - 62 KB]
      Bldg 103 [PDF - 1 MB]
      Bldg 103D [PDF - 1 MB]
      Bldg 103E [PDF - 1 MB]
      Bldg 104 [PDF - 1 MB]
      Bldg 104E [PDF - 2 MB]
      Bldg 104F [PDF - 1 MB]
      Bldg 105 [PDF - 6 MB]
      Bldg 106 [PDF - 2 MB]
      Bldg 107 [PDF - 1 MB]
      Bldg 110 [PDF - 1 MB]

      Bldg 104 air and wipe sampling March 7 [PDF - 309 KB]
      Bldg 104 air and wipe sampling March 21 [PDF - 1 MB]
      Bldg 107 air and wipe sampling March 3 [PDF - 1 MB]
      Bldg 107 air and wipe sampling March 15 [PDF - 320 KB]
      Bldg 107 air and wipe sampling March 31 [PDF - 376 KB]

      April  

      Bldg 104 air and wipe sampling April 4 [PDF - 301 KB]
      Bldg 104 air and wipe sampling April 18 [PDF - 290 KB]
      Bldg 105 air and wipe sampling April 4 [PDF - 307 KB]
      Bldg 105 air and wipe sampling April 18 [PDF - 302 KB]
      Bldg 107 air and wipe sampling April 11 [PDF - 376 KB]
      Bldg 107 air and wipe sampling April 18 [PDF - 301 KB]

      May   Bldg 104 air and wipe sampling May 10 [PDF - 515 KB]
      Bldg 107 air and wipe sampling May 10 [PDF - 347 KB]
      June   Bldg 104 air and wipe sampling June 2 [PDF - 296 KB]
      Bldg 104 air and wipe sampling June 27 [PDF - 316 KB]
       

      Introduction [PDF - 91 KB]
      Bldg 103 [PDF - 379 KB]
      Bldg 103D [PDF - 367 KB]
      Bldg 103E [PDF - 345 KB]
      Bldg 104 [PDF - 524 KB]
      Bldg 104E [PDF - 369 KB]
      Bldg 104F [PDF - 352 KB]
      Bldg 105 [PDF - 663 KB]
      Bldg 105E [PDF - 361 KB]
      Bldg 105L [PDF - 361 KB]
      Bldg 106 [PDF - 326 KB]
      Bldg 107 [PDF - 384 KB]
      Bldg 110 [PDF - 362 KB]

      Introduction [PDF - 91 KB]
      Bldg 103 [PDF - 376 KB]
      Bldg 103D [PDF - 376 KB]
      Bldg 103E [PDF - 378 KB]
      Bldg 103E revised [PDF - 375 KB]
      Bldg 104 [PDF - 493 KB]
      Bldg 104E [PDF - 372 KB]
      Bldg 104F [PDF - 354 KB]
      Bldg 105 [PDF - 1 MB]
      Bldg 105E [PDF - 386 KB]
      Bldg 105L [PDF - 375 KB]
      Bldg 105 Appendix A [PDF - 247 KB]
      Bldg 105 Appendix B [PDF - 220 KB]
      Bldg 105 field notes [PDF - 145 KB]
      Bldg 106 [PDF - 343 KB]
      Bldg 107 [PDF - 383 KB]
      Bldg 110 [PDF - 368 KB]

      July  

      Bldg 104 air and wipe sampling July 14 [PDF - 308 KB]
      Bldg 104 air and wipe sampling July 29 [PDF - 1 MB]

      August  

      Bldg 104 air and wipe sampling Aug. 12 [PDF - 303 KB]
      Bldg 107 air and wipe sampling Aug. 12 [PDF - 1 MB]
      Bldg 104 air and wipe sampling Aug. 24 [PDF - 1 MB]
      Bldg 107 air and water sampling Aug. 24 [PDF - 1 MB]

      September   Bldg 104 air and water sampling Sept. 7 [PDF - 909 KB]
      Bldg 107 air and water sampling Sept. 7 [PDF - 864 KB]
      Bldg 104 air and water sampling Sept. 22 [PDF - 1 MB]
      Bldg 107 air and water sampling Sept. 22 [PDF - 1 MB]
      October Bldg 103 [PDF - 3 MB]     
      Bldg 103D [PDF - 3 MB]     
      Bldg 103E [PDF - 3 MB]
      Bldg 104 [PDF - 3 MB]     
      Bldg 104E [PDF - 4 MB]     
      Bldg 104F [PDF - 4 MB]
      Bldg 105 [PDF - 16 MB]     
      Bldg 105E [PDF - 3 MB]     
      Bldg 105L [PDF - 3 MB]
      Bldg 106 [PDF - 3 MB]
      Bldg 107 [PDF - 3 MB]

      Bldg 104 air and water sampling Oct. 4 [PDF - 696 KB]
      Bldg 107 air and water sampling Oct. 4 [PDF - 613 KB]
      Bldg 104 air and water sampling Oct. 18 [PDF - 702 KB]
      Bldg 107 air and water sampling Oct. 18 [PDF - 586 KB]

      November  
      December  

        2021 records

        Building 104 print shop air and wipe sampling [PDF - 695 KB]

        Memo #28: Drinking water and agency personal property sampling results, lead-based paint in stairwells, additions to contaminated spaces [PDF - 64 KB]

        November 2021 soil sampling report [PDF - 43 MB]

        Introduction to report of wipe sampling from Building 104 [PDF - 62 KB]

        Introduction to report of wipe sampling from Building 107 [PDF - 58 KB]

        Drinking water sampling summary [PDF - 54 KB]

        Report on lead-based paint in stairwells [PDF - 2 MB]

        Wipe sampling from agency personal property

        Introduction to report of wipe sampling from Building 105 HVAC areas [PDF - 58 KB]

        Introduction to reports of asbestos in crawlspaces and tunnels [PDF - 55 KB]

        Memo #27: Biannual air and wipe sampling and follow up to drinking water, air and wipe sampling [PDF - 164 KB]

        August 2021 wipe resampling of exceedances in June 2021 [PDF - 716 KB] (Buildings 102E, 103, 103D, 103E, 104, 104F, 105, 105F, 105L, 107 and 110)

        Wipe sampling summary [PDF - 135 KB]

        Air sampling summary [PDF - 59 KB]

        Exterior equipment wipe sampling summary [PDF - 62 KB]

        Memo #26: Drinking water sampling results, SSSP for working under raised floors, groundwater monitoring wells [PDF - 117 KB]

        Drinking water sampling summary [PDF - 54 KB]

        Missouri Department of Natural Resources-approved remedial investigation work plan [PDF - 14 MB]

        Quarterly groundwater sampling reports

        Building 104

        Memo #25: Campus-wide air and wipe sampling results [PDF - 147 KB]

        Air sampling summary [PDF - 178 KB]

        March 2021 wipe resampling of exceedances in December 2020 [PDF - 753 KB] (Buildings 103, 103D, 103E, 104, 104F, 105, 105F, 105L, 110 and 115)

        February 2021 wipe resampling of exceedances in December 2020 [PDF - 101 KB] (Buildings 103, 103D, 103E, 104, 104F, 105, 105F, 105L, 110 and 115)

        Wipe sampling summary [PDF - 228 KB]

        2020 records

        Memo #24: Recent sampling results, follow-up to campus-wide wipe sampling [PDF - 137 KB]

        Drinking water summary [PDF - 111 KB]

        Wipe resampling summary [PDF - 11 KB]

        Memo #23: Recent sampling results, changes to the reading room, GSA OIG implementation review, completion of over 70” high cleaning, completion of Bldgs. 105 and 110 basement exhaust projects, formal decision to dispose of Goodfellow [PDF - 298 KB]

        Air sampling summary [PDF - 112 KB]

        Wipe sampling summary [PDF - 122 KB]

        Memo #22: Recent drinking water sampling results, completion of Buildings 105 and 110 basement exhaust projects [PDF - 58 KB]

        Drinking water summary [PDF - 100 KB]

        Memo #21: Recent sampling results, update on Bldgs. 105 and 110 basement exhaust projects, reminders for those preparing to relocate [PDF - 140 KB]

        Air sampling summary [PDF - 107 KB]

        Wipe sampling summary [PDF - 108 KB]

        New protocol for surfaces higher than 70 inches at Goodfellow [PDF - 216 KB]

        Clearance sampling from Building 110 negative air project

        2019 records

        Memo #20: Recent sampling results, dust monitoring results (Bldgs. 104 and 110), Bldg. 105 basement exhaust project schedule [PDF - 89 KB]

        Introduction to reports of air sampling for chromium [PDF - 110 KB]

        Summary of sampling for airborne mercury-containing dust [PDF - 96 KB]

        Introduction to reports of drinking water sampling [PDF - 56 KB]

        Summary of dust monitoring [PDF - 76 KB]

        Memo #19: Recent sampling results, dust-monitoring results, update on Building 105 project [PDF - 146 KB]
        Building 103 wipe samples after build-out of Census space [PDF - 2 MB]

        OSHA comparative air and wipe sampling

        Dust monitoring

        Memo #18: Air and wipe sampling results [PDF - 79 KB]

        Air Sampling Summary [PDF - 111 KB]

        Wipe Sampling Summary [PDF - 109 KB]

        Memo #17: Projects in Buildings 110, 103, audit resolution memorandum [PDF - 95 KB]
        Office of Inspector General’s Audit Resolution Memorandum [PDF - 146 KB]

        Memo #16: Activities since February update [PDF - 93 KB]

        Wipe sampling results from controlled spaces in Buildings 101, 103 and 110 [PDF - 6 MB]

        Drinking Water Sampling Summary [PDF - 12 KB]

        Air Sampling Summary [PDF - 16 KB]

        Memo #15: Update on release of GSA OIG audit [PDF - 40 KB]
        Memo #14: Summary of the last year [PDF - 173 KB]

        2018 records

        Summary of wipe sampling from controlled space [PDF - 6 KB]

        July 2018 progress report for OSHA 1120691 [PDF - 90 KB]
        July 2018 pre-alteration assessment for lead-based paint electrical vaults in Buildings 103, 103F, 105, and 107 [PDF - 2 MB]
        July 2018 air sampling from basement of Building 110 [PDF - 1 MB]
        April 2018 OSHA comparative air and wipe sampling from Building 104 [PDF - 1 MB]

        Summary of drinking water sampling [PDF - 12 KB]

        Summary of air sampling [PDF - 13 KB]

        January 2018 progress report for OSHA 1120691 [PDF - 618 KB]

        2017 records

        Memo #13: Actions GSA has completed over the summer and early autumn [PDF - 158 KB]
        Fall 2017 wipe sampling from horizontal louvers in Buildings 102E, 103, 103E, 103F, 104, 104E, 104F, 105, 105E, 105F, 105L, 107, and 110 [PDF - 3 MB]
        Fall 2017 wipe sampling from electrical vaults in Buildings 103, 103F, 104, 105, 107, 108A, 108B, and 110 [PDF - 13 MB]
        Photos of Elevator Guarding [PDF - 2 MB]
        Summer 2017 air sampling Buildings 102E, 103, 103D, 103E, 103F, 104, 104E, 104F, 105, 105E, 105F, 105L, 106, 107, 110, and 115 [PDF - 5 MB]

        Drinking water sampling

        July 2017 Goodfellow progress report for OSHA [PDF - 608 KB]
        Memo #12: Remedial investigation and remedial action plan, moving forward [PDF - 45 KB]

        September 2016 Goodfellow remedial investigation [PDF - 14 MB]
        September 2017 Missouri Department of Natural Resources review of Remedial Investigation [PDF - 549 KB] 

        Bldg 104 South File Area Fact Sheet [PDF - 811 KB]

        April 2017 air and water sampling complex wide and wipe sampling Buildings 102E, 103E, 107 [PDF - 5 MB]

        February 2017 GSA petition to OSHA to modify abatement [PDF - 497 KB] 
        February 2017 OSHA response to GSA request for extension [PDF - 96 KB] 
        Memo #11: OSHA update, Building 104, campus-wide remediation [PDF - 46 KB] 
        February 2017 Goodfellow progress report for OSHA [PDF - 769 KB] 

        2016 records

        March 2016 air and wipe sampling complex wide [PDF - 9 MB]
        Bldg 107 Water Sample Results [PDF - 92 KB] 
        Bldg 110 Water Sample Results [PDF - 2 MB] 
        Memo #10: HVAC systems [PDF - 44 KB] 
        Memo #9: NIOSH recommendations, progress on cleanup plan for interiors, indoor air and water sampling update [PDF - 40 KB]
        Memo #8: Indoor air and water sampling, investigating the outdoor environment [PDF - 37 KB] 
        Memo #7: Town hall recap, upcoming campus-wide activities, Bldg. 104 update [PDF - 43 KB] 
        Memo #6: Town halls, Bldg. 104 update, OSHA citation report [PDF - 46 KB] 
        Memo #5: GEI and NIOSH Letter, OSHA citation [PDF - 40 KB]
        OSHA Citations and Sampling Data [PDF - 9 MB] 
        NIOSH 10-Day Letter [PDF - 173 KB] 
        GSA Response Letter to OSHA [PDF - 305 KB] 
        OSHA Response to GSA Letter [PDF - 99 KB] 
        Bldg 104 VA Records Center Sampling Results [PDF - 2 MB] 
        Bldg 102E Sampling Results [PDF - 264 KB] 
        NIOSH Final Report [PDF - 179 KB] 
        Memo #4: Bldgs. 103, 104 and 105 mechanical areas update, Bldg. 104 update, the difference between OSHA and NIOSH [PDF - 42 KB] 
        Memo #3: Lead dust concentrations in Bldg. 104, Buildings 103, 104 and 105 mechanical areas, NIOSH visit [PDF - 41 KB] 
        Memo #2: What’s happening, is it a Superfund site? [PDF - 117 KB] 
        Memo #1: Intro on environmental conditions [PDF - 166 KB] 

        2015 records

        Mercury Vapor Crawlspaces and Tunnels [PDF - 99 KB] 

        2013 records

        Occupational Exposure Evaluation - 1 of 5 [PDF - 3 MB] 
        Occupational Exposure Evaluation - 2 of 5 [PDF - 2 MB] 
        Occupational Exposure Evaluation - 3 of 5 [PDF - 3 MB] 
        Occupational Exposure Evaluation - 4 of 5 [PDF - 16 MB] 
        Occupational Exposure Evaluation - 5 of 5 [PDF - 1 MB] 

        2012 records

        ACM Removal Report, Bldg. 122B [PDF - 7 MB] 
        Bldg 141C Asb LBP Reinspect [PDF - 366 KB] 
        Asb Bldg 107 [PDF - 566 KB] 
        Plan for 2013 Occupational Exposure Assessment [PDF - 2 MB] 
        Bldg 107 Asbestos Abatement Closeout Report (Crawlspace) [PDF - 2 MB] 
        Bldg 107 Crawlspace Clean-Up Closeout Report - 1 of 5 [PDF - 9 MB] 
        Bldg 107 Crawlspace Clean-Up Closeout Report - 2 of 5 [PDF - 10 MB] 
        Bldg 107 Crawlspace Clean-Up Closeout Report - 3 of 5 [PDF - 5 MB] 
        Bldg 107 Crawlspace Clean-Up Closeout Report - 4 of 5 [PDF - 12 MB] 
        Bldg 107 Crawlspace Clean-Up Closeout Report - 5 of 5 [PDF - 5 MB] 
        Bldg 107 Asbestos and Lead Abatement Close Out Report - 1 of 6 [PDF - 9 MB] 
        Bldg 107 Asbestos and Lead Abatement Close Out Report - 2 of 6 [PDF - 11 MB] 
        Bldg 107 Asbestos and Lead Abatement Close Out Report - 3 of 6 [PDF - 10 MB] 
        Bldg 107 Asbestos and Lead Abatement Close Out Report - 4 of 6 [PDF - 13 MB] 
        Bldg 107 Asbestos and Lead Abatement Close Out Report - 5 of 6 [PDF - 5 MB] 
        Bldg 107 Asbestos and Lead Abatement Close Out Report - 6 of 6 [PDF - 14 MB] 
        Bldg 102D Asbestos Air Testing Report [PDF - 1 MB] 

        2011 records

        Bldg 122B Asbestos Abatement Closeout Report [PDF - 1 MB] 

        2010 records

        Asbestos Bulk Sample Test Results Childcare Center Bldg 104E [PDF - 484 KB] 
        Limited Site Investigation for Sewer Project [PDF - 2 MB] 
        Enviro File Review & Summary [PDF - 1 MB] 

        2009 records

        Lead Air and Wipe Sampling Report [PDF - 2 MB] 
        Screen Shot - Childcare Center Water Retest Results [JPG - 119 KB] 
        LBP Wipe Samples [PDF - 999 KB] 
        Childcare Center Lead and Drinking Water Test Report [PDF - 5 MB] 

        2008 records

        Sampling Results for Lead, Bldg 104 [PDF - 455 KB] 
        Bldg 103F Crawlspace and Cafeteria Lead [PDF - 8 MB] 
        Asbestos, Lead and Mold Testing for Bldg 105F Crawlspace (cafeteria project) [PDF - 10 MB] 
        PASI COMBINED REPORT - 1 of 9 [PDF - 10 MB] 
        PASI COMBINED REPORT - 2 of 9 [PDF - 12 MB] 
        PASI COMBINED REPORT - 3 of 9 [PDF - 12 MB] 
        PASI COMBINED REPORT - 4 of 9 [PDF - 13 MB] 
        PASI COMBINED REPORT - 5 of 9 [PDF - 15 MB] 
        PASI COMBINED REPORT - 6 of 9 [PDF - 13 MB] 
        PASI COMBINED REPORT - 7 of 9 [PDF - 8 MB] 
        PASI COMBINED REPORT - 8 of 9 [PDF - 13 MB] 
        PASI COMBINED REPORT - 9 of 9 [PDF - 18 MB]
        PASI LEAD WIPE ADDENDUM [PDF - 3 MB] 

        2007 records

        Closeout Report: Asbestos Abatement Bldgs 104/105 for USDA [PDF - 11 MB] 

        2004 records

        Radon Test Results for Childcare and Bldg 104 [PDF - 1 MB] 
        Bldg 103 Mold Sampling Summary [PDF - 516 KB] 
        Site Investigation Report for Bldg 103 [PDF - 2 MB] 
        Site Investigation Report, Bldg 104 [PDF - 3 MB]
        Site Investigation Lab Reports, Bldg 104 [PDF - 3 MB]
        Site Investigation Lab Reports, Bldg 108 [PDF - 8 MB]

        2003 records

        Site Investigation Report: Bldgs. 102, 103, 104 and 112 [PDF - 4 MB]
        Site Investigation Lab Report [PDF - 4 MB]
        Bldg 105 Firing Range Final Cleanup Report - 1 of 7 [PDF - 1 MB] 
        Bldg 105 Firing Range Final Cleanup Report - 2 of 7 [PDF - 13 MB] 
        Bldg 105 Firing Range Final Cleanup Report - 3 of 7 [PDF - 12 MB] 
        Bldg 105 Firing Range Final Cleanup Report - 4 of 7 [PDF - 12 MB] 
        Bldg 105 Firing Range Final Cleanup Report - 5 of 7 [PDF - 11 MB] 
        Bldg 105 Firing Range Final Cleanup Report - 6 of 7 [PDF - 11 MB] 
        Bldg 105 Firing Range Final Cleanup Report - 7 of 7 [PDF - 8 MB] 
        PASI Proposal [PDF - 760 KB] 
        Result of Environmental Hygiene & Safety Survey [PDF - 2 MB] 
        Lead-Mercury Lab Analysis [XLS - 43 KB] 
        Childcare Center Lead and Mercury Sampling Report [PDF - 619 KB] 
        Summary of Results, IAQ Air Sampling in Bldg 103 [PDF - 57 KB] 

        2002 records

        Demolition Soil Lead Test, Bldg 105 Parking [PDF - 55 KB]
        Phase I Environmental Site Assessment* [PDF - 622 KB]

        *Attachments and references in this report are available upon request.